Go Aweigh2452
11-04-2007, 02:30 PM
Well, winter project #1 completed in under 3 hours start to finish. Go here for the run down by photo:
New Floor in the Cabin (http://www.curtisnjrotc.com/htdocs1/boatflr.htm)
Before: http://www.curtisnjrotc.com/htdocs1/goaweighto/floorboat/caretbefore.JPG
After: http://www.curtisnjrotc.com/htdocs1/goaweighto/floorboat/flrfmcockpit.JPG
I used a Home Depot simulated wood product (Actually a linoleum that simulates wood)... Total cost was less than $50. And I have half a case of the flooring left over...
New Floor in the Cabin (http://www.curtisnjrotc.com/htdocs1/boatflr.htm)
Before: http://www.curtisnjrotc.com/htdocs1/goaweighto/floorboat/caretbefore.JPG
After: http://www.curtisnjrotc.com/htdocs1/goaweighto/floorboat/flrfmcockpit.JPG
I used a Home Depot simulated wood product (Actually a linoleum that simulates wood)... Total cost was less than $50. And I have half a case of the flooring left over...